News

Installation Procedure Of Plastic Welding Machine

Mar 15, 2021 Leave a message

1.The welding machine should be placed on a firm, level workbench. There should be a space greater than 150mm behind the machine to facilitate ventilation and heat dissipation.

2.To ensure safe operation, the machine must be grounded reliably, and the resistance to ground must be less than 4 ohms.

⒊Insert both ends of the Sanli control wire into the three-pin socket at the back of the welding machine, and tighten the nuts.

⒋Set the selector switch to the manual position.

⒌Tighten the four lifting screws to fix the ultrasonic vibrating head, but do not use excessive force to avoid sliding teeth.

⒍Wipe the contact surface between the upper welding mold and the ultrasonic vibrating head, connect them with screws, and lock them with a special wrench. The locking torque is 25 Newtons/m.

⒎Connect the air pipe of the external air source to the air filter of the welding machine.

⒏Sound wave inspection program


Send Inquiry